2019 Measure M Streets Task Force

Print
Press Enter to show all options, press Tab go to next option

Of the $2 million dollars in Street Maintenance Program funding, $200,000 has been dedicated to the Measure M Streets Task Force this year. This program is dedicated to address deferred/backlogged street maintenance. Projects include but are not limited to: street paving, manhole repairs, base failure repairs, concrete repairs, and drainage repairs. Just this year we were able to repair over 9,665 SQ FT of concrete throughout the City.