2019 Crack Seal

Print
Press Enter to show all options, press Tab go to next option

Of the $2 million dollars in Street Maintenance Program funding, $40,000 has been dedicated to the 2019 Crack Seal Project.  Crack Sealing is a preventative maintenance treatment that extends the life of roads by sealing existing cracks which eliminates water from infiltrating the road. Moisture infiltration is a leading cause of pre-mature pavement failure including pot holes. Just this year we were able to seal over 23,515 LN FT of streets throughout the City.