Jepson Parkway Project

The 12-mile Jepson Parkway project is an I-80 Reliever Route that will improve intra-county mobility for Solano County residents. The project upgrades a series of narrow local roads to provide a north-south travel route for residents as an alternative to I-80. The plan proposes a continuous four-lane roadway from the State Route 12 / Walters Road intersection in Suisun City to the I-80 / Leisure Town Road interchange in Vacaville. The project also includes safety improvements, such as the provision for medians, traffic signals, shoulders, and separate bike lanes.

The Jepson Parkway project is divided into 10 segments for design and construction purposes. Five (5) construction projects within the Jepson Parkway project have been completed: the extension of Leisure Town Road, from Alamo to Vanden; the relocation of the Vanden/Peabody intersection; improvements to Leisure Town Road bridges; the Walters Road Widening (Suisun City); and the I-80/Leisure Town Road Interchange (Vacaville).

The City of Vacaville, Public Works Engineering Services Division, has entered into a multi-agency agreement to perform design of the Leisure Town Road section of Jepson Parkway from Commerce Place to Vanden Road. Vacaville Engineering Services has also entered into an agreement to design the Solano County portion which runs south on Vanden Road from Leisure Town Road to the northern Fairfield City limit line.

Environmental Documents

The Solano Transportation Authority (STA) website contains general information on the Jepson Parkway Project including timelines, agreements, environmental decision documents, appendices, and comment responses. Links to these pages are listed below:

General Information, Agreements and Environmental Decision Documents

Technical Documents

Design Documents

Preliminary geometric design for the portion of the Jepson Parkway Project from Leisure Town Road at Commerce Place to the intersection of Leisure Town Road and Vanden Road are currently under design. Documents will be made available for download as submittals are completed at 35, 65, and 95 percent design phases of work.

Construction Plans

65% Design