MAJOR PROJECT UPDATES
2008 Asphalt Concrete Overlay Project
The project will include a 1.5” thick Rubberized Asphalt Concrete overlay on Nut Tree Parkway (from Allison Drive to Helen Power Drive), Harbison Drive (from Ulatis Drive to Nut Tree Parkway), Ulatis Drive (from Allison Drive to Nut Tree Road), and Peabody Road (from California Drive to the southern city limits). Additional work will include replacement of existing curb ramps with new ramps that meet the Americans with Disabilities Act requirements, striping, new traffic loop detectors, and adjustment of existing facilities.
The contractor continues replacing curb ramps and lowering valve boxes and manholes in the areas to receive rubberized hot mix asphalt overlay.
Dobbins
The contractor constructed forms for the concrete bents, and began welding steel beams for the bridge falsework. The contractor continues preparation of the subgrade for the roadway section at the south east corner of the intersection of
Traffic Engineering staff has reviewed and commented on phase II plans for the Dobbins/Monte Vista Intersection Improvements Project. The second phase will deal with the reconstruction of the interior lanes of the east leg of
Construction is planned to be complete by December 2008.
Construction of the Pleasants Valley Detention Basins begins Summer 2008. The contractor is currently proceeding with the materials submittal process and has commenced mobilizing to the project site.
The City completed the land acquisition for the planned Alamo Creek and
Traffic Engineering is working with