City of Vacaville - Public Works - Wastewater

Northeast Sector Sewer Master Plan

The Northeast Sector Sewer Master Plan update reflects the City's current planning with respect to the anticipated sanitary sewer needs for northeastern Vacaville, identifying remaining actions needed to meet those needs.

 

Final Draft (December 1, 2009) of Master Plan:

Summary, Sections 1 & 2 (PDF - 4.3 MB)

Executive Summary

Section 1: Introduction

Section 2: Policies and Methodology

Sections 3-5 (PDF - 6.7 MB)

Section 3: Horse Creek Lift Station Plan Area

Section 4: Upper NESAD Plan Area

Section 5: Lower NESAD Plan Area

Appendicies (PDF - 1.8 MB)

Appendix A: Point Load Capacity Allocation

Appendix B: Cost Estimates

Appendix C: Assessor's Parcel Maps

Appendix D: Genentech Flow and Peaking Factor Summary

Appendix E: Calculation for NESAD Cost Share for Areas A and W 

Appendix F: Funding Flow Chart for NESAD Sewer Projects

          

The final draft report will be considered for adoption at the City Council meeting on December 8, 2009 at City Hall at 7:00 pm in the Council Chambers.  Questions may be sent to: